ROV KIEL 6000

Specifcations & Logistics | Cruise Schedule & Statistics | ROV-Team | Image Gallery

Overview | Logistics | Cameras | Navigation & Sensors | Sampling | Launch & Recovery System | Controls

 

Launching Frame & Block

The launching frame consists of 2 to 3 modules, depending on the ship, and a so-called plate which is connected to the frame by 2 pressure dampers. The frame is mounted to the ship's a-frame using a dedicated crossbar. 

The ROV itself is lifted into the frame, launched and recovered by an auxiliary winch, which is mounted onto to a-frame. In order to reduce tension on the the umbilical, it is routed through a block which is also mounted on the a-frame aside of the launching frame

Photos (unless otherwise noted): ROV-Team, GEOMAR. For enquiries on usage of image mterial please contact  Communications and Media Dept. GEOMAR or Dr. Friedrich Abegg.

back..

  •  

    Scientific Head 

    Dr. Friedrich Abegg
    GEOMAR Helmholtz Centre for Ocean Research Kiel
    Wischhofstr. 1-3
    D-24148 Kiel
    Technology & Logistics Centre
    Tel.: 0049 431 600-2134
    Fax: 0049 431 600-2680
    E-mail: fabegg(at)geomar.de   


    Technical Head

    Martin Pieper (Dipl. Ing.)
    Technology & Logistics Centre
    Tel.: 0049 431 600-1688
    Fax: 0049 431 600-2680
    E-mail: mpieper(at)geomar.de 


    Scientific Advisor

    Prof. Dr.Colin Devey
    FB4: Dynamics of the Ocean Floor
    Tel.: 0049 431 600-2257
    Fax: 0049 431 600-2924
    E-mail: cdevey(at)geomar.de